Module 8 - A203

Writing Requirements When ITS Standards Do Not Have SEP Content
Webinar Chat Transcript

Date: November 29, 2:00-3:30p.m. ET

(Note: This document has been converted from the transcript to 508-compliant HTML. The formatting has been adjusted for 508 compliance, but all the original text content is included.)

Learning Assessment 1: Can anyone remember the “D” word that is used to describe this activity?
Answer:

Decomposition

Learning Assessment 2: Name the Pitfall Game - 6.1.4.2 Serial Bus #2 System Messages. Command/Response Messages shall use similar message format as Serial Bus #1, collecting operational status, detection speed reports, occupancy reports, counts, etc.
Answer:

Unbounded

Learning Assessment 3: Name the Pitfall Game - 6.2.2.4 Enclosure Door Frames and Door Seals. The dimension between the door edge and the enclosure external surface when the door is closed and locked shall be 0.156 inch (+/-0.08 inches).
Answers:

Over constrained
Over specified
Design or over specified or over constrained

Learning Assessment 4: Name the Pitfall Game - 6.4.7.8 Power Distribution Assembly Wiring. Three 36-inch minimum length #8 gauge wires, one black for AC+, one white for AC-, and one green or green/yellow for equipment ground, shall be attached to the rear of the assembly at the AC raw power terminating block.
Answers:

Design and implementation
Should be separated into two

Learning Assessment 5: Name the Pitfall Game - 5.4.2 Public Safety. The system shall use the low-voltage output options available in the ITS Cabinet Standard Version 2 (currently in development).
Answer:

Assumptive

Learning Assessment 6: Name the Pitfall Game - 5.3.2 Startup Considerations. The Engine Board low-level hardware and O/S initialization shall be completed and application software shall be capable of exercising control of all ATC unit hardware within a maximum of 4.5 seconds.
Answers:

Unbounded
Over constrained

Question: Why is design not included in the requirements?
Question: Do you mean subject matter expert or SE expert?
Answer:
You might use a systems engineering expert

Question: Could you add "and a selected group of intersections?"
Answer:
I suppose that could be another requirement. So you could have a selected intersection or a selected group of intersections.

Question: Another SE expert who has advised me on a project hates the term "shall allow the operator" He prefers "the system shall <action>..." What do you think?
Answer:
That is acceptable also.

Question: Would you use requirements to buy something off the shelf?
Answer:
Yes, you can do that.

Comment: Good example of needing to think if someone else could misinterpret your requirement.

Learning Assessment 7: To understand that requirements development is a_____
Answer:

Process

Learning Assessment 8: To avoid ___________ when writing requirements
Answer:

Pitfalls

Learning Assessment 9: How to write requirements when an ITS communication standard does not have _____ information.
Answer:

SEP

Learning Assessment 10: To use ________________ matrices as tools for requirements development.
Answer:

Traceability

Comments:
Thank you
Thanks!