Learning Assessment 1: Can anyone remember the “D” word that is used to describe this activity?
Answer:
Decomposition
Learning Assessment 2: Name the Pitfall Game - 6.1.4.2 Serial Bus #2 System Messages. Command/Response Messages shall use similar message format as Serial Bus #1, collecting operational status, detection speed reports, occupancy reports, counts, etc.
Answer:
Unbounded
Learning Assessment 3: Name the Pitfall Game - 6.2.2.4 Enclosure Door Frames and Door Seals. The dimension between the door edge and the enclosure external surface when the door is closed and locked shall be 0.156 inch (+/-0.08 inches).
Answers:
Over constrained
Over specified
Design or over specified or over constrained
Learning Assessment 4: Name the Pitfall Game - 6.4.7.8 Power Distribution Assembly Wiring. Three 36-inch minimum length #8 gauge wires, one black for AC+, one white for AC-, and one green or green/yellow for equipment ground, shall be attached to the rear of the assembly at the AC raw power terminating block.
Answers:
Design and implementation
Should be separated into two
Learning Assessment 5: Name the Pitfall Game - 5.4.2 Public Safety. The system shall use the low-voltage output options available in the ITS Cabinet Standard Version 2 (currently in development).
Answer:
Assumptive
Learning Assessment 6: Name the Pitfall Game - 5.3.2 Startup Considerations. The Engine Board low-level hardware and O/S initialization shall be completed and application software shall be capable of exercising control of all ATC unit hardware within a maximum of 4.5 seconds.
Answers:
Unbounded
Over constrained
Question: Why is design not included in the requirements?
Question: Do you mean subject matter expert or SE expert?
Answer:
You might use a systems engineering expert
Question: Could you add "and a selected group of intersections?"
Answer:
I suppose that could be another requirement. So you could have a selected intersection or a selected group of intersections.
Question: Another SE expert who has advised me on a project hates the term "shall allow the operator" He prefers "the system shall <action>..." What do you think?
Answer:
That is acceptable also.
Question: Would you use requirements to buy something off the shelf?
Answer:
Yes, you can do that.
Comment: Good example of needing to think if someone else could misinterpret your requirement.
Learning Assessment 7: To understand that requirements development is a_____
Answer:
Process
Learning Assessment 8: To avoid ___________ when writing requirements
Answer:
Pitfalls
Learning Assessment 9: How to write requirements when an ITS communication standard does not have _____ information.
Answer:
SEP
Learning Assessment 10: To use ________________ matrices as tools for requirements development.
Answer:
Traceability