ITS Deployment
- Complete Trip – ITS4US Deployment
- Vehicle-to-Infrastructure Resources
- Connected Vehicle Pilots
- Connected Vehicle News and Events
- Connected Vehicle Deployer Resources
- Connected Vehicle Deployment Assistance
- Connected Vehicle Applications
- Sample Deployment Concepts
- Connected Vehicle Publications
- National ITS Architecture
- Smart City Challenge
Publications
Technical Reports for Phase 2 Design, Build, and Test
Wyoming (WY) DOT Pilot Technical Reports
- FHWA-JPO-17-467, Systems Architecture Document - WYDOT
- FHWA-JPO-17-468, Systems Design Document - WYDOT
- FHWA-JPO-17-469, Data Privacy Plan - WYDOT
- FHWA-JPO-17-470, Data Management Plan - WYDOT
- FHWA-JPO-17-471, Comprehensive Installation Plan - WYDOT
- FHWA-JPO-17-472, Operational Readiness Plan - WYDOT
- FHWA-JPO-17-473, Comprehensive Maintenance and Operations Plan - WYDOT
- FHWA-JPO-17-474, System Performance Reports - WYDOT
- FHWA-JPO-17-496, Deployment Outreach Plan- WYDOT
- FHWA-JPO-19-762, Interface Control Document (ICD) - WYDOT
New York City (NYC) DOT Pilot Technical Reports
- FHWA-JPO-17-451, Systems Architecture Document - NYCDOT (coming soon)
- FHWA-JPO-17-452, Systems Design Document - NYCDOT (coming soon)
- FHWA-JPO-17-453, Data Privacy Plan - NYCDOT
- FHWA-JPO-17-454, Data Management Plan - NYCDOT
- FHWA-JPO-17-455, Comprehensive Installation Plan - NYCDOT
- FHWA-JPO-17-456, Operational Readiness Plan - NYCDOT (coming soon)
- FHWA-JPO-17-457, Comprehensive Maintenance and Operations Plan - NYCDOT
- FHWA-JPO-17-458, System Performance Reports - NYCDOT (coming soon)
- FHWA-JPO-18-674, Deployment Outreach Plan - NYCDOT (coming soon)
Tampa (THEA) Pilot Technical Reports
- FHWA-JPO-17-459, Systems Architecture Document - Tampa (THEA)
- FHWA-JPO-17-460, Systems Design Document - Tampa (THEA)
- FHWA-JPO-17-461, Data Privacy Plan - Tampa (THEA)
- FHWA-JPO-17-462, Data Management Plan - Tampa (THEA)
- FHWA-JPO-17-463, Comprehensive Installation Plan - Tampa (THEA)
- FHWA-JPO-17-464, Operational Readiness Plan - Tampa (THEA)
- FHWA-JPO-17-465, Comprehensive Maintenance and Operations Plan - Tampa (THEA)
- FHWA-JPO-17-466, System Performance Reports - Tampa (THEA)
- FHWA-JPO-17-479, Deployment Outreach Plan - Tampa (THEA)
- FHWA-JPO-18-693, Security Management Operational Concept - Tampa (THEA)
USDOT Technical Reports
- Information Flow (Triples) Spreadsheet*
- Consolidated Message Content (Data Object Alignment) Spreadsheets*
- FHWA-JPO-18-644, V2I Hub Deployment Guide
- FHWA-JPO-18-712, Connected Vehicle Pilot Deployment Program- Driving Towards Deployment: Lessons Learned from the Design/Build/Test Phase
- FHWA-JPO-18-691, Connected Vehicle Pilots Phase 2 Interoperability Test, Test Plan
- FHWA-JPO-18-707, Connected Vehicle Pilots Phase 2 Interoperability Test, Test Report
*These documents are available by request by emailing cvpilots@dot.gov.
Research Contacts
Katherine K. Hartman
CV Pilots Program Manager
ITS Joint Program Office
(202) 366-2742
Kate.Hartman@dot.gov