Recent U.S. Department of Transportation Publications in 2022

The U.S. Department of Transportation (U.S. DOT) has released several new reports highlighting its latest research initiatives and findings. To download these reports, click the links below or visit the National Transportation Library.


Title/Publication Number

Description

Connected Vehicle Pilot Deployment Program Phase 3, Understanding and Enabling Cooperative Driving for Advanced Connected Vehicles in New York City – New York City Department of Transportation (NYCDOT) (FHWA-JPO-21-920)

This white paper explores the applicability of cooperative driving for advanced connected vehicles (CD for ACV) on urban roadways based on insights, data analysis, and stakeholder feedback documented as a part of the U.S. DOT Connected Vehicle (CV) Pilot Deployment.

Mobile Accessible Pedestrian Signal System (PED-SIG) Application Test Summary and Evaluation Report – New York City (FHWA-JPO-22-921)

This study identified four signalized intersections instrumented with CV technologies and designed six predefined routes to test the Pedestrian Signal System (PED-SIG) application, as developed by the U.S. DOT CV Pilot Deployment Program.

Connected Vehicle Pilot Deployment Program Independent Evaluation, Stakeholder Acceptance and User Satisfaction Assessment—Wyoming (FHWA-JPO-22-940)

This report presents the stakeholder acceptance and user satisfaction evaluation conducted by the Texas A&M Transportation Institute (TTI) Independent Evaluation Team of the Wyoming DOT (WYDOT) CV Pilot Deployment.

Connected Vehicle Pilot Deployment Program Independent Evaluation, Stakeholder Acceptance & User Satisfaction—New York City (NYC) (FHWA-JPO-22-942)

This report presents the stakeholder acceptance and user satisfaction evaluation conducted by the TTI independent evaluation team of the New York City (NYC) CV Pilot Deployment.

Connected Vehicle Pilot Deployment Program Independent Evaluation, Financial and Institutional Assessment—New York City (FHWA-JPO-22-943)

The purpose of the institutional evaluation was to assess the organizational changes that stem from the NYC CV Pilot Deployment, including the systematic evaluation of the effects of institutional changes in NYC to identify potential strategies to minimize institutional risk.

Connected Vehicle Pilot Deployment Program Phase 3, Comprehensive Transition Plan – WYDOT (FHWA-JPO-18-724)

This document presents a plan to effectively transition the Wyoming DOT (WYDOT) CV Pilot Deployment from the pilot stage to continuous operation of the system as part of WYDOT’s regular operations.

Safety Impact Assessment of New York City Connected Vehicle Pilot Safety Applications (FHWA-JPO-22-937)

This report presents the methodology and results of the safety impact assessment of five vehicle-to-vehicle (V2V) and four vehicle-to-infrastructure (V2I) safety applications that were deployed in the NYC CV Pilot Deployment site.

Connected Vehicle Pilot Deployment Program Independent Evaluation, Mobility Impact Assessment—Wyoming (FHWA-JPO-22-949)

This report uncovers the findings of the TTI qualitative assessment of the mobility impacts of the WYDOT CV Pilot Deployment.

Connected Vehicle Pilot Deployment Program Independent Evaluation, Public Agency Efficiency Impact Assessment—Wyoming (FHWA-JPO-22-950)

This report uncovers the findings of the TTI qualitative assessment of the impacts of the WYDOT CV Pilot Deployment on public agency efficiency.

Connected Vehicle Pilot Deployment Program Independent Evaluation, Environmental Impact Assessment—Wyoming (FHWA-JPO-22-951)

This report uncovers the findings of the TTI qualitative assessment of environmental impacts of the WYDOT CV Pilot Deployment.

Connected Vehicle Pilot Deployment Program Independent Evaluation, National-Level Synthesis Report (FHWA-JPO-22-953)

This report provides a national-level synthesis report that summarizes the challenges, findings, critical lessons learned, and impacts from the three CV Pilot Deployment sites and discusses the implications of these impacts on future CV deployment across the United States.

Truck Platooning Early Deployment Assessment – Independent Evaluation: Expanded Analysis Plan (FHWA-JPO-22-962)

This report presents an expanded analysis plan that will provide generalized answers to truck platooning research questions that cover topics areas including additional truck platoon analysis, expanded geographical analysis, impacts on traffic flow, impacts on surrounding vehicle behavior, and more.

Connected Vehicle Pilot Deployment Program Independent Evaluation, Financial & Institutional Assessment—Wyoming (FHWA-JPO-22-952)

This report presents the financial and institutional evaluation of the WYDOT CV Pilot Deployment conducted by the TTI CV Pilot Deployment Evaluation Team.

Phase 1 Outreach Plan – California Association for Coordinated Transportation ITS4US Deployment Project (FHWA-JPO-21-911)

The purpose of this report is to provide a full description of all planned outreach efforts for all phases of the California Association for Coordinated Transportation (CALACT) ITS4US Deployment Project.

Phase 1 Outreach Plan – Buffalo, NY ITS4US Deployment Project (FHWA-JPO-21-913)

This report provides the Outreach Plan for the Buffalo, NY ITS4US Deployment Project to promote and ensure stakeholder engagement.

Connected Vehicle Pilot Deployment Program Independent Evaluation, Financial and Institutional Assessment—Tampa (THEA) (FHWA-JPO-22-939)

This report presents the financial and institutional evaluation conducted by the TTI CV Pilot Deployment Evaluation Team of the Tampa Hillsborough Expressway Authority (THEA).

Phase 1 Integrated Complete Trip Deployment Plan – Atlanta Regional Commission ITS4US Deployment Project (FHWA-JPO-22-944)

This document serves as the Integrated Complete Trip Deployment Plan for the Atlanta Regional Commission ITS4US Deployment Project.

Phase 1 Integrated Complete Trip Deployment Plan – California Association for Coordinated Transportation ITS4US Deployment Project (FHWA-JPO-22-945)

This document serves as the Integrated Complete Trip Deployment Plan for the CALACT ITS4US Deployment project.

Phase 1 Integrated Complete Trip Deployment Plan - Heart of Iowa Regional Transit Agency ITS4US Deployment Project (FHWA-JPO-22-946)

This document serves as the Integrated Complete Trip Deployment Plan for the Heart of Iowa Regional Transit Agency ITS4US Deployment Project.

Phase 1 Integrated Complete Trip Deployment Plan - Buffalo, NY ITS4US Deployment Project (FHWA-JPO-22-947)

This document serves as the Integrated Complete Trip Deployment Plan for the Buffalo, NY ITS4US Deployment Project.

Phase 1 Integrated Complete Trip Deployment Plan - University of Washington ITS4US Deployment Project (FHWA-JPO-22-948)

This document serves as the Integrated Complete Trip Deployment Plan for the University of Washington ITS4US Deployment Project.

12/6/22