Note: These notes record remarks made in six breakout groups without indicating the amount of consensus regarding the remarks either within or among the different groups.
Research Needs |
Level of Priority (High, Medium, Low) |
Beginning dates (Winter, Spring, Summer, Fall CY) |
Check here if it MUST begin in FY 05 |
What are the dependencies?
What is it dependent on?
What is it dependent for? |
Driver Performance |
1) Characterize normal and non-normal driver maneuvers at intersections in varied, real-world test conditions |
H-32
M-4
L-1 |
FY 05-2
Spring 05-5
FY 06-1 |
24 |
What are the dependencies?
- This activity is needed in order to determine the alert timing parameters
What is it dependent on?
- There is some ongoing work (e.g., the 100 car study)
- Need to determine what data is available for mining and what data needs to be collected
- Need for development of data collection systems and amplified naturalistic driving conditions through a set of intersections
- Need to evaluate and develop collection techniques (e.g., observational, infrastructure and vehicle sensing)
What is it dependent for?
- Needed to measure the before baseline in order to measure the effect of adding countermeasures
- Absolutely critical to the driver interface (DVI, DII)
|
2) Determine alert timing parameters |
H-23
M-10
L-1 |
FY 05-1
Winter 05-2
Spring 05-1
Summer 05-1
FY 06-1
FY 07-1 |
15 |
What are the dependencies?
- This activity is needed in order to test out algorithms for models and operational systems
What is it dependent on?
- There is some ongoing work (e.g., the 100 car study)
- Need to define what are we warning the drivers about
- Depends on characterizing normal and non-normal driver maneuvers at intersections in varied, real-world test conditions
- Need a better handle on "acceptable safe vs. unsafe" gaps
- Current algorithms need to be refined based on how driver is behaving/driver characteristics data
What is it dependent for?
- Absolutely critical to the driver interface done by VTTI, General Dynamics
|
3) Measure time-to-collision (TTC) overestimation by driver
Note: This activity is a subset of question #1 |
H-9
M-12
L-7 |
FY 05-1
Spring 05-1
FY 06-1 |
7 |
What are the dependencies?
- This activity is needed in order to determine the alert timing parameters
What is it dependent on?
- This will be different for different intersections, but will be less of an issue for simple scenarios
- Depends on current research results and may be a need to build on that existing research
- Some work being done by CAMP and will be public soon
- Determine gap selection
- Need a measure of drivers normal behavior
What is it dependent for?
- Critical for determining LTAP countermeasures
|
4) Determine effectiveness of various interface approaches and their interaction with varied timing approaches
Note: This is part of normal testing |
H-21
M-11
L-4 |
Ongoing
FY 05-1
Spring 05-1 |
10 |
What are the dependencies?
- Needed to start optimizing the DII for a broad set of drivers
What is it dependent on?
- Coordinate and build on current work including, MN & CA efforts in FY 05
- Use information from previous FOT
- DVI work being done by CAMP, VTTI, others
- Need to work on the issue regarding the vehicle not sending information to the infrastructure for it to make a decision
What is it dependent for?
- This is part of the normal testing process, but may need to be expanded
|
5) Investigate the effects of driver distraction and inattention
Note: This is part of normal testing |
H-10
M-8
L-10 |
Winter 05-1
Spring 06-1 |
9 |
What are the dependencies?
- Important for determining algorithm timing
- Evaluation of FOT
What is it dependent on?
- Dependent on application
- Current data collection efforts (e.g., the 100 car study)
- Long term data collection process needed
- Depends on #2
What is it dependent for?
- All SCP crashes (unwillful) involve this
- This is part of the normal testing process, but may need to be expanded
|
6) Investigate long-term driver behavioral adaptation, either positive or negative
Note: This item duplicates #28 |
H-10
M-14
L-10 |
FY 05-1
FY 07-2
Spring 07-2
FY 09-1 |
3 |
What are the dependencies?
What is it dependent on?
- Need an operational system first
- Needs to be examined long term, > 5 year period
- This data will be provided by the FOT
- Methodology needed for FOT design
- The DII needs to be optimized
- Depends on current research results and mining of national databases
What is it dependent for? |
Driver Interface |
7) Develop design guidelines and performance specifications for DII |
H-19
M-11
L-2 |
Ongoing
FY 05-1
Spring 05-1
FY 06-1
Fall 06-1
Fall 09-1 |
12 |
What are the dependencies?
What is it dependent on?
- Depends on #4 and #8
- Need an operational test system first because effectiveness cannot be measured until prototypes are selected
- Tests should be performed on a small number of the intersections pre-FOT
- This should only be done in conjunction with DVI
What is it dependent for? |
8) Measure effectiveness of DII |
H-18
M-9
L-4 |
Spring 05-2
Ongoing |
8 |
What are the dependencies?
What is it dependent on?
- Depends on #4 and #8
- Need an operational test system first because effectiveness cannot be measured until prototypes are selected
- Tests should be performed on a small number of the intersections pre-FOT
- This should only be done in conjunction with DVI
- Work should start now and will require iterations
- First test effectiveness in driving simulator then test in "live" intersection
- This activity is fundamental, but less time critical
- Depends on current research results
What is it dependent for?
- Evaluations performed after FOT
|
9) Determine preferred modality (combination of auditory, visual, and haptic alerts) of DVI
Note: This is restated in #10. |
H-16
M-8
L-7 |
FY 06-2
Winter 06-1
Fall06-1
FY 07-1 |
7 |
What are the dependencies?
- Establishing minimum performance requirements
What is it dependent on?
- There is already good knowledge of this and existing research findings should be leveraged, as well as ongoing work
- Evaluate after the test vehicle is built
- This should only be done in conjunction with DVI
What is it dependent for?
- This is an area where OEM's will differentiate
|
10) Specify of haptic alerts
Note: This is a subset of #9 |
H-2
M-9
L-8 |
Winter 05-1
Fall 06-1 |
3 |
What are the dependencies?
What is it dependent on?
- Some work already underway, but more research needs to be done
- Not sure this is applicable to CICAS
- This is an OEM issue
What is it dependent for? |
11) Refine message content and timing |
H-16
M-7
L-2 |
Winter 05-1
FY 06-1
Summer 06-1
Fall 07-1 |
3 |
What are the dependencies?
What is it dependent on?
- Depends on #4
- Need to continue current efforts and refine concepts
- Cannot refine until first message set defined
- Each application will require different message sets with overlap
- This is an OEM issue
What is it dependent for? |
Technology Development |
12) Add CICAS capabilities or add CICAS interfaces to legacy and advanced traffic controllers |
H-26
M-5
L-3 |
FY 05-3
Winter 05-2
Spring 05-1
Fall 06-1 |
15 |
What are the dependencies?
What is it dependent on?
- Requires specifications on timings
- Need to provide this critical data NOW!
What is it dependent for?
- Need to provide this critical data now to show operational value of CICAS
- Needed for prototype system
|
13) Determine requirements for accuracy of vehicle position |
H-32
M-1
L-1 |
FY 05-2
Winter 05-2
Spring 05-1
Spring 06-1
Summer 06-1 |
19 |
What are the dependencies?
What is it dependent on?
- Depends on #1
- Need to develop system architecture and requirements for both infrastructure and vehicle
- Define levels of accuracy absolute/lane level/relative
- VTTI has developed some specifications, need to begin providing this for SCP
- This requires a new detector system
What is it dependent for?
- Critical to all aspects of CICAS related to timing issues
|
14) Determine requirements for accuracy of vehicle speed, acceleration, braking status, heading angle by in-vehicle sensors, by positioning systems |
H-24
M-3
L-6 |
FY 05-2
Winter 05-1
Spring 05-1 |
12 |
What are the dependencies?
What is it dependent on?
- Depends on #1
- VTTI has developed some specifications, need to begin providing this for SCP
- Important for infrastructure only models, because this is an infrastructure sensor issue
- Need requirements for measuring accuracy of all sensors and need concept of operations
- Vehicle position and kinematics dependent on naturalistic data, other data, prototypes, functional requirements
- Is iteration of alert algorithms what follows? Need to answer, "What sensors can get you what you need?"
What is it dependent for?
- Critical to all aspects of CICAS related to timing issues
- Development of state map
|
15) Specify infrastructure-vehicle communications |
H-19
M-7
L-2 |
FY 05-2
Spring 05-1 |
9 |
What are the dependencies?
What is it dependent on?
- Need to understand budget for deployment
- Need to answer, "What role does DSRC play here?" Need to start discussions about DSRC Message Frequency, testing, etc.
- OK to assume DSRC is short-term
- Specify communication parameters, but not specific technology.
- SAE message committee final specification follows testing
- CICAS protocols should start now
- Need to standardize the message set
What is it dependent for? |
16) Detection of pedestrians and bicyclists in the intersection |
H-13
M-12
L-6 |
Winter 05-1
Spring 05-1
FY 06-4 |
9 |
What are the dependencies?
What is it dependent on?
- Research needs to be done for detection
- Is this an ITS Tier 2 issue
- Need a long lead time and this is technically very challenging
- See UMN work
- Applies only to GAP acceptance
What is it dependent for?
- Clearly they matter, but should CICAS be responsible?
|
17) Design CICAS protocols to be run over DSRC; design DSRC MAC layer protocols for high density traffic conditions |
H-16
M-4
L-3 |
Winter 05-1
Spring 05-1
Winter 06-1
FY 07-1 |
4 |
What are the dependencies?
What is it dependent on?
- Let's see if it works first
- Given deployment schedule will be 802.11 xxx anyway
- Much of this work is being done in VII
- DSRC is NOT proven and this will be an issue
- Communication issue, VSC2 will do this
- Systems architecture and requirements needed
- Message set is main issue
What is it dependent for? |
18) Determine dynamic power and data rate control strategies |
H-6
M-12
L-9 |
Winter 05-1
Spring 05-1
Winter 06-1 |
6 |
What are the dependencies?
What is it dependent on?
- Interdependent with # 17
- DSRC and VII design issue
- Dependent on high DSRC penetration
- Being worked on, VII issue with ASME
- Need prototype DSRC radio first
What is it dependent for? |
19) Define CICAS message sets and dictionaries for submission to standards developing organizations |
H-10
M-9
L-6 |
FY 05-1
Spring 05-1
FY 09-2 |
9 |
What are the dependencies?
What is it dependent on?
- Depends on #4 and #15
- Need to get concepts refined for detailed design
- Message sets define further work
What is it dependent for? |
System Integration |
20) Determine whether the performance characteristics of various systems architecture meet specified requirements |
H-13
M-7
L-4 |
Spring 05-1
Summer 05-1
FY 06-2
FY 07-1 |
4 |
What are the dependencies?
What is it dependent on?
- Depends on #4 and #11
- Need to follow a Systems Engineering process
- This is not well defined and depends on concepts refinement then analysis of architecture and specifications
What is it dependent for? |
21) Improve methods to fuse data from multiple sensors on vehicle position |
H-18
M-9
L-4 |
Winter 05-1
Spring 05-1
FY 06-1
Summer 06-1 |
8 |
What are the dependencies?
What is it dependent on?
- Dependent on #15 and #16
- Operational systems must precede this event and must be done prior to determining the worthiness of the project
- For mixed vehicular/infrastructure this is key, but need to solve same detection problems
- Challenging problem..must work with sparse and dense data
- Vehicle data depends on DSRC deployment
- Functional allocation dependent on data from vehicle
- Cost effectiveness to put inside a vehicle is important
What is it dependent for? |
Decision Rules |
22) Collect baseline data at live intersections
Note: This item duplicates #1 |
H-25
M-7 |
FY 05-1
Winter 05-1
Spring 05-1
FY 06-1
Winter 06-1 |
7 |
What are the dependencies?
What is it dependent on?
- Must start selecting intersections now in order to get baseline data for analysis in 05/06
- Can begin immediately especially benchmarking of available technologies for flexible implementation
- Some work is ongoing
- Needed for driver behavior analysis
- Depends on understanding behavior and having an architecture
- Dependent on delivery surrogate safety measures a system for collecting the SSM data
- This is needed to create state map and should be started now
- This depends on the sensor suite used
- Legacy system upgrades, vehicle data comm., control strategies
What is it dependent for? |
23) Analyze existing data, including SAVME, VTTI Naturalistic driving study, case study of Crashworthiness Data System (CDS) data (none of which appear promising)
Note: This item duplicates #6 |
H-13
M-13
L-5 |
Spring 05-1
Winter 06-1 |
7 |
What are the dependencies?
What is it dependent on?
- This may provide a baseline investigation on what worked
- Key point is none appear promising, not sure that existing data can be mined to extract needed information, I don't think it will give any significant information
- This is a cheap and easy way to increase the value of the databases, biased towards intersection behaviors
- May help immediately with needs identification for draft functional requirements
- Need to identify data requirements and data collection methods
- Need the development of a more advanced infrastructure data collection system and to run a naturalistic driver study through a set of monitored intersections
- Look at 100 car study 43,000 hours, 100,000's of intersections (of all kinds) crossing accessible in short term
What is it dependent for? |
24) Develop understanding of false alarm rate, miss rate, driver acceptance of computations |
H-25
M-7
L-4 |
Winter 05-1
Spring 05-1
FY 06-2 |
7 |
What are the dependencies?
What is it dependent on?
- Should occur after FOT
- Prototype subsystem needed now and available test bed
- Second phase issue: need to evaluate early test results
- Dependent on driver reaction to technology reliability
- Hard to classify "hit" or "miss" when no event occurs ???
What is it dependent for? |
Impact |
25) Measure CICAS safety benefits in comparison to other traffic control devices |
H-14
M-8
L-5 |
Spring 05-1
FY 07-1
FY 09-1 |
3 |
What are the dependencies?
What is it dependent on?
- No way to accurately model without well designed FOT
- Cannot do until CICAS performance is quantified (otherwise just a guess)
- Need this before the FOT and add as baseline condition
- Measure CICAS benefits in comparison to unsignalized intersections
What is it dependent for? |
26) Refine economic impact models of intersection collisions |
H-7
M-7
L-9 |
Spring 05-1
FY 09-1 |
3 |
What are the dependencies?
What is it dependent on?
- Need for cost benefits analysis
- No way to model without well designed FOT
- Need this before the FOT
What is it dependent for? |
27) Determine costs and benefits of alternative CICAS approaches |
H-12
M-8
L-5 |
FY 07-1
Spring 07-1
FY 09-1 |
1 |
What are the dependencies?
What is it dependent on?
- Need available data, especially from car companies and OEM's, ROI, User Demand
- Cannot do until optimal set is deployed and costs determined
What is it dependent for? |
28) Investigate long-term driver behavioral adaptation, either positive or negative
Note: This item duplicates #6 |
H-6
M-2
L-5 |
FY 09-1 |
1 |
What are the dependencies?
What is it dependent on?
- Need this for FOT
- Evaluate prototype before we can start the adaptation issue
What is it dependent for? |